Secondhand Sponge Iron Plant Capacity 1.1 Lac TPA


Sponge Iron Plant [87218]

LAND
TOTAL AREA UNDER POSSESION -- -- 79ACRS.
DEVELOPED AREA -- WITH BOUNDARY WALL -- 40Acrs.
(Balance Land for Staff Quarter, Approach Road and Char Dumping)
ADDITIONAL 65 ACRES OF GOVT. LAND BEHIND & ADJACENT TO THE POWER PLANT WILL BE ALLOTED WITHIN 1-2MONTHS FROM IDCO. (All the related paper work completed & the file forwarded to District Collector for Final Allotment by IDCO.)

LIST OF PLANT & MACHINERY
Sponge Iron Plant
TOTAL SPONGE IRON CAPACITY - 1.1 LAC TPA
Location : Orissa


S.No. Particulars MAKE Nos.
1 KILN & COOLING SHELL-350TPD BEEKAY ENGG. 1
2 TRANSFORMER 1600 KVA TRUEVOLT 1
3 ELECTRIC MAIN PANEL ABB 1
4 INSTRUMENTATION PANEL ABB 1
5 AC VARIABLE SPEED DRIVES WITH PANEL ABB 1
6 DC ELECTRIC MOTOR (MAIN-150KW + 1SPARE) KIRLOSKAR 2
7 BELT CONVEYOR & ACCESSORIES BEEKAY ENGG. 1
8 IMPACT CRUSHERS BEEKAY ENGG. 2
9 VIBRATING SCREENS BEEKAY ENGG. 4
10 VIBRATING FEEDERS BEEKAY ENGG. 5
11 TRAMP IRON SEPARATOR BEEKAY ENGG. 1
12 DRUM TYPE MAGNATIC SEPARATOR BEEKAY ENGG. 2
13 WEIGH FEEDERS ELECTRO ZAVED 5
14 PNEUMATICS & HYDRAULICS GUJRAT HYDRAULIC 1
15 SWIRLERS, AIR TUBE, H.P. TUBE . 1
16 NOZZLE PLANTES C.B.PIPE, COALPIPE . 1
17 BI-METTALIC SLIP RING BEEKAY ENGG. 1
18 DP VALVES . 1
19 FILTERATION & LUBRICATION UNIT . 1
20 AIR BLOWER . 4
21 ELECTRICAL SLIP RING . 18
22 GEAR BOXES & ACCESSORIES ELECECON / SHANTI 11
23 ROTARY AIR LOCK FEEDERS . 2
24 COOLING WATER PUMPS . 4
25 LOBE COMPRESSOR 110HP USHA 2
26 SCREW COMPRESSOR 75HP CP 2
27 CENTRALISED GREASE PUMP UNIT CROMPTON 1
28 LDO PUMP CROMPTON 1
29 WATER COOLING NOZZLES . 10
30 BAG FILTERS & FANS REICO 7
31 LIGHTING & FITTINGS . 1
32 COOLING TOWER . 2
33 GAS CONDITIONING TOWER BEEKAY ENGG. 1
   

Power Plant TOTAL TURNKEY PROJECT BY THERMAX
TOTAL POWER PLANT CAPACITY
4MW - AFBC
8MW - WHRB
4MW - GRID (Under implementation)


S.No. Particulars MAKE Nos.
1 AFBC BOILER 22 TPH THERMAX 1
2 GAS CONDITIONING TOWER . 1
3 ELECTROSTATIC PRECIPITATOR THERMAX 2
4 COOLING TOWER 3600m3 PER Hr. PAHARPUR 2
5 STEAM TURBINE 12MW TRIVENI 1
6 DM PLANT 5m3 PER Hr. WITH PRE FILTRATION PLANT . 1
7 COOLING WATER PUMPS 200KW EACH KIRLOSKAR 3
8 ASH HANDLING SYSTEMS . 1
9 ASH SILO . 1
10 COAL HANDLING SYSTEM . 1
11 AIR COMPRESSOR CP 1
12 CONTROL ROOM A.C. SYSTEM . 1
13 EOT CRANE FOR TURBINE 40MT REVA 1
14 SWITCH GEAR & CONTROL PANEL FOR BOILER ABB 1
15 TURBINE PUMPS, BOILER FEED PUMPS & OTHER PUMPS . 14
16 SUBSTATION EQUIPMENTS & CABLES . 1
17 TRANSFORMER 2000KVA TRUVOLT 1
18 REFRACTORY FOR BOILER & DUST SILO TRL 1
19 CHIMNEY & MECHANICAL STRUCTURE . 1
20 PLANT ILLUMINATION SYSTEMS . 1
21 WHR BOILER -- 38TPH THERMAX 1
22 BAG FILTERS REICO 1
23 PNEUMATIC CONVEYOR SYSTEM FOR FLY ASH HANDLING . 1
24 GRID POWER PROJECT UNDER IMPLEMENTATION -4MW (EQUIPMENTS ORDERED, TOWER LINE INSTALLATION COMPLETED) . .
   

Steel Melting Shop
TOTAL SMS CAPACITY
4 FURNACE x 11 HEATS PER DAY
(CONSERVATIVE TARGET)
x 8MT x 300 DAYS = 1.05 LAKHS MT. P.A


S.No. Particulars MAKE Nos.
1 INDUCTION FURNACE 8MT EACH (WITH POWER PACK, 8 CRUCIBLES & 4 TRANSFORMERS OF 3725 KVA EACH) INDUCTOTHERM 4
2 COOLING TOWER PAHARPUR 2
3 DM PLANT PAHARPUR 1
4 HT & LT PANELS WITH CAPACITOR BANK SEIMENS 1
5 TRANSFORMER MAIN & AUXILIARY KIRLOSKAR 3
6 EOT CRANE 1No --40MT, 2Nos --15MT, 1No --10MT REVA 4
7 CRANE GIRDER WITH DSL LINE . 2
8 LADDLE FOR REFINNING FURNACE--16MT --2Nos, 8MT --2Nos INDUCTOTHERM 4
9 CONTINUOUS CASTING MACHINE DOUBLE STAND (4X7) CONCAST INDIA 1
10 PUMPS (DIFFERENT CAPACITIES) . 8
11 PIPING & VALVES . 1
12 SUBSTATION EQUIPMENTS & CABLES . 1
13 MAGNETS . 3
14 MATERIAL HANDLING EQUIPMENTS . 1
15 D.G.SET WITH PANEL 500KVA JACKSON 4
16 WEIGH BRIDGES 100MT & 60MT . 1
17 LAB EQUIPMENTS . 1
18 TOOLS & EQUIPMENTS . 1
19 BAG FILTERS & FANS REICO 3
20 LIGHTING & FITTINGS . 1
21 AUXILIARIES FOR SMS & CCM . 1
22 LADDLE PRE-HEATING FURNACE INDUCTOTHERM 2
23 PNEUMATICS & HYDRAULICS GUJRAT HYDRAULIC 1
24 SCREW COMPRESSOR CP 2
25 ELECTRIFICATION . .
26 TUNDISH TRL 4
   

R.M.Handling System
Auxiliary, Supporting Equipments & Civil Construction


S.No. Particulars MAKE Nos.
1 IRON ORE CRUSHERS (ONLINE) 50TPH EACH MR UDYOG 2
2 COAL CRUSHERS (ONLINE) 40TPH EACH MR UDYOG 2
3 CONVEYOR LINE FOR COAL & IRON ORE IN HOUSE 1200Mtrs
4 STOCK HOUSE -- 6BINS OF (200 & 100MT CAPACITY) BEEKAY 1
5 PRODUCT HOUSE -- 6BINS OF 100MT EACH BEEKAY 1
6 INTERMEDIARY BUNKER BEEKAY 1
7 LUMP COAL CRUSHER (INDEPENDENT UNIT WITH SHED & CONVEYOR SYSTEM -- 40TPH CAPACITY MR UDYOG 1
8 DOLO CHAR BUNKER -- 200MT BEEKAY 1
9 DIESEL FILLING STATION -- 2 DISPENSERS 15KL EACH STORAGE TANKS INDIAN OIL 1
10 3 STORIED CONTROL ROOM BUILDING (FULLY AIR CONDITIONED WITH CENTRAL LAB, DIRECTORS CHAMBER, HOD CHAMBERS, CONFERENCE ROOM, REST ROOM, 3TOILETS, PANTRY ETC.) IN HOUSE 1
11 2 STOREYED ACCOUNTS & DESPATCH OFFICE BUILDING (AIR CONDITIONED) IN HOUSE 1
12 RIVER WATER INTAKE WELL (2 VERTICAL PUMPS 75HP EACH) IN HOUSE 1
13 WATER STORAGE RCC TANKS (25LAKH LITERS & 10 LAKH LITERS) IN HOUSE 2
14 RAW MATERIALS & FINISHED PRODUCTS SHEDS AMIYA ENGG. 6
15 FLY ASH BRICKS MANUFACTURING UNIT IN HOUSE 1
16 SECURITY & TIME OFFICE IN HOUSE 1
17 GENERAL STORES BUILDING IN HOUSE 0
18 SMS STORES BUILDING IN HOUSE 1
19 DRI STORES BUILDING IN HOUSE 1
20 POWER PLANT BUILDING IN HOUSE 4
21 WATCH TOWERS IN HOUSE 4
22 STAFF & WORKERS VEHICLE & CYCLE PARKING STAND IN HOUSE 1
23 COLONY FOR 300 WORKERS (OUTSIDE PLANT PREMISES) IN HOUSE 1
24 SLAG CRUSHING UNIT (UNDER IMPLEMENTATION) MR UDYOG 1
25 FULLY RCC INTERNAL ROADS (UNDER CONSTRUCTION) . .
26 COMPLETE RCC DRAINAGE SYSTEM (UNDER CONSTRUCTION) . .
27 LOADERS AND VEHICLES - 2NOS. JCB 430Z HEAVY DUTY LOADERS, 2NOS. JCB BACHOE LOADERS, 2NOS. SCORPIO, 2NOS BOLERO, 1 NO. MINI BUS. . 9
   

Back to Secondhand Machinery List